Call 1800 663 339

Minnesota Road, Wyong

Project Background

Wyong Shire Council closed Minnesota Road at Hamlyn Terrace for a period of approximately five months to complete a major $5.6 million upgrade. The culvert construction consisted of around 100 metres of concrete drainage, and the new road was raised approximately 1.5 metres above the existing causeway level.

Moddex worked with Wyong Shire Council to provide Modular Bikesafe Barriers along the refurbished stretch of roadway.

Products/configurations used on project

Bikesafe BS40

Why was Moddex product selected?

Moddex was chosen to ensure compliance to Austroads, and for the safety of cyclists. As there was a significant drop from the edge of the path, a cyclist would have incurred severe injuries in the case of an accident. Moddex was the obvious choice because it could be cost effectively installed by council employees/contractors when time permitted.

Location

Wyong Shire, NSW

 
Client

Wyong Shire Council

 
Industry

Civil, Council

Featured Products

DOWNLOAD OUR
PRODUCT BROCHURE
REGISTER TO DOWNLOAD
CAD FILES

Do You Need Technical Support?ENQUIRE NOW